ShoreTension FPSO project mooring


Often the safety of a moored vessel is paramount for a successful project.

ShoreTension delivered and installed 4 Dynamic Mooring Systems to safely secure an FPSO for a period well over 3 months.

As ShoreTension is a closed system of energy, it does not require an external energy source to operate. Berth where the FPSO was moored is mainly exposed to high wind and swell.