Long term – FPSO mooring

ShoreTension has successfully closed out a long term mooring project in Scotland. After providing a safe berth in over 61 knots of wind, more than 1.550 tidal changes – in other words 13 months of continuous installation – ShoreTension was released from a departing vessel. Interesting detail is that ShoreTension does not require an additional power source to operate and was installed without being permanently mounted to the berth.