ShoreTension has successfully supported during an off loading operation of heavy equipment. Purpose of the ShoreTension installation, was to keep the vessel stable during the load-out operation. Minimized longitudinal and lateral movement of a vessel is crucial for a safe and successful completion during (un)loading operations.
Category: News
Long term – FPSO mooring
ShoreTension has successfully closed out a long term mooring project in Scotland. After providing a safe berth in over 61 knots of wind, more than 1.550 tidal changes – in other words 13 months of continuous installation – ShoreTension was released from a departing vessel. Interesting detail is that ShoreTension does not require an additional […]
ShoreTension® in Tanger, Morocco
The port of Tanger experienced strong seasonal offshore wind and swell penetrating the Port. This causes unwanted vessel movements. ShoreTension deployed 4 Dynamic Mooring Systems that reduces vessel motion reduction up till 90%. ShoreTension® is a flexible and green mooring system which keeps the vessels safely alongside in mentioned conditions.